Basic acceptance
Host hoisting in place
Exhaust, fuel, cooling system check
Electrical equipment installation
Ground wire installation
Diesel Generator set wiring
Generator Set debugging
Trial operation acceptance
Generator foundation
Check the basic dimensions and the location of the buried or reserved holes on the foundation. The base surface should be free of cracks, voids, exposed ribs and corners. According to the position of the building axis provided by the civil engineering and the horizontal line of the elevation, the distance between the installation reference line and the building axis is checked, and the deviation between the installation reference line and the equipment plane position and the elevation is installed.